Sushi Hiro
project details
| Location | Federal Way, WA |
| Project Type | Tenant Improvement (TI) |
| Category | Restaurants and Cafe |
| Size | 5,286 sq. ft. |
| Completion Year | 2022 |
Expert Project Recovery and Corrective Engineering
When Sushi Hiro faced significant setbacks due to complications with a previous contractor, PDK Corporation was engaged to step in and stabilize the project. Our team specialized in rectifying non-compliant practices and performing deep corrective engineering to ensure the 5,286 sq. ft. facility met all local Federal Way building codes and safety standards. By assuming the role of General Contractor mid-stream, we successfully navigated the existing structural and system challenges to bring this premier dining destination back to life.
Key Solutions & Impact
Corrective Engineering
We meticulously identified and addressed improper work left by the prior firm, ensuring all structural and system components were brought to professional standards.
Accelerated Project Recovery
After taking over a stalled site, our team optimized workflows to finish the entire scope within a condensed 5-month window.
Specialized Systems Integration
Our crew managed the complex installation of ANSUL fire suppression systems and specialized walk-in refrigeration units essential for high-end sushi operations.
Project Salvage & Vitality
By providing transparent communication and technical reliability, we saved the client’s investment and delivered a revitalized building that reopened with a renewed sense of vitality.
Services Provided
Structural & Exterior
Framing, Concrete, Roofing, Windows, and Doors.
Mechanical & Life Safety
HVAC, ANSUL Systems, Fire Sprinkler, and Fire Alarm installation.
Specialized Kitchen
Walk-in Cooler and Freezer installation, Plumbing, and Electrical.
Interior Finishing
Drywall, Painting, Flooring, and Custom Lighting.
Project Gallery
